Piping Maintenance Pipelines-completed Client: Eni Iraq / Ministry of Oil Location: Iraq Value: 2,800,000 USD Starting Work: 2012 Share This Tweet Share Share Email Related Posts M&P + civil foundation installation 4 km flow line – size 6″ Client: BP Iraq/Rumaila Operating Organisation (ROO) Location: Rumaila Oil Field Value: 6,755,980.00 USD Starting Work:… Design, Construction of 12KM Water Pipeline – Size 10” Client: Council of the Governorate of Basra Location: Kubbaisa, Basrah Value: 1,330,000.00 USD Work Period:… Pipeline Maintenance Contract Location: Basrah, Al-Zubair, Burjsia Project Implementation was scheduled for 2 years. Total cost of the…
M&P + civil foundation installation 4 km flow line – size 6″ Client: BP Iraq/Rumaila Operating Organisation (ROO) Location: Rumaila Oil Field Value: 6,755,980.00 USD Starting Work:…
Design, Construction of 12KM Water Pipeline – Size 10” Client: Council of the Governorate of Basra Location: Kubbaisa, Basrah Value: 1,330,000.00 USD Work Period:…
Pipeline Maintenance Contract Location: Basrah, Al-Zubair, Burjsia Project Implementation was scheduled for 2 years. Total cost of the…