Piping Maintenance Pipelines-completed Client: Eni Iraq / Ministry of Oil Location: Iraq Value: 2,800,000 USD Starting Work: 2012 Share This Tweet Share Share Email Related Posts M&P + civil foundation installation 4 km flow line – size 6″ Client: BP Iraq/Rumaila Operating Organisation (ROO) Location: Rumaila Oil Field Value: 6,755,980.00 USD Starting Work:… Basra – Al-Zubair—Burjsia Project Implementation is scheduled for 2 years. Total cost of the project: $3,600,000 US Dollar. Design, Construction of 12KM Water Pipeline – Size 10” Client: Council of the Governorate of Basra Location: Kubbaisa, Basrah Value: 1,330,000.00 USD Work Period:…
M&P + civil foundation installation 4 km flow line – size 6″ Client: BP Iraq/Rumaila Operating Organisation (ROO) Location: Rumaila Oil Field Value: 6,755,980.00 USD Starting Work:…
Basra – Al-Zubair—Burjsia Project Implementation is scheduled for 2 years. Total cost of the project: $3,600,000 US Dollar.
Design, Construction of 12KM Water Pipeline – Size 10” Client: Council of the Governorate of Basra Location: Kubbaisa, Basrah Value: 1,330,000.00 USD Work Period:…