Piping Maintenance Pipelines-completed Client:Eni Iraq B.V Location: Zubair Value: Call Off Work Period: Mar 2012 – March 2014 Share This Tweet Share Share Email Related Posts M&P + civil foundation installation 4 km flow line – size 6″ Client: BP Iraq/Rumaila Operating Organisation (ROO) Location: Rumaila Oil Field Value: 6,755,980.00 USD Starting Work:… Pipeline Installation Client: SOC / Ministry of Oil Location: Iraq Value: 36,000,000 USD Starting Work: 2010 Design, Construction of 12KM Water Pipeline – Size 10” Client: Council of the Governorate of Basra Location: Kubbaisa, Basrah Value: 1,330,000.00 USD Work Period:…
M&P + civil foundation installation 4 km flow line – size 6″ Client: BP Iraq/Rumaila Operating Organisation (ROO) Location: Rumaila Oil Field Value: 6,755,980.00 USD Starting Work:…
Pipeline Installation Client: SOC / Ministry of Oil Location: Iraq Value: 36,000,000 USD Starting Work: 2010
Design, Construction of 12KM Water Pipeline – Size 10” Client: Council of the Governorate of Basra Location: Kubbaisa, Basrah Value: 1,330,000.00 USD Work Period:…