Pipeline Installation Pipelines-completed Client: SOC / Ministry of Oil Location: Iraq Value: 36,000,000 USD Starting Work: 2010 Share This Tweet Share Share Email Related Posts Pipeline Maintenance Contract Location: Basrah, Al-Zubair, Burjsia Project Implementation was scheduled for 2 years. Total cost of the… Piping Maintenance Client:Eni Iraq B.V Location: Zubair Value: Call Off Work Period: Mar 2012 - March 2014 M&P + civil foundation installation 4 km flow line – size 6″ Client: BP Iraq/Rumaila Operating Organisation (ROO) Location: Rumaila Oil Field Value: 6,755,980.00 USD Starting Work:…
Pipeline Maintenance Contract Location: Basrah, Al-Zubair, Burjsia Project Implementation was scheduled for 2 years. Total cost of the…
Piping Maintenance Client:Eni Iraq B.V Location: Zubair Value: Call Off Work Period: Mar 2012 - March 2014
M&P + civil foundation installation 4 km flow line – size 6″ Client: BP Iraq/Rumaila Operating Organisation (ROO) Location: Rumaila Oil Field Value: 6,755,980.00 USD Starting Work:…