Basra – Al-Zubair—Burjsia Pipelines-completed Project Implementation is scheduled for 2 years. Total cost of the project: $3,600,000 US Dollar. Share This Tweet Share Share Email Related Posts Design, Construction of 12KM Water Pipeline – Size 10” Client: Council of the Governorate of Basra Location: Kubbaisa, Basrah Value: 1,330,000.00 USD Work Period:… M&P + civil foundation installation 4 km flow line – size 6″ Client: BP Iraq/Rumaila Operating Organisation (ROO) Location: Rumaila Oil Field Value: 6,755,980.00 USD Starting Work:… Pipeline Maintenance Contract Location: Basrah, Al-Zubair, Burjsia Project Implementation was scheduled for 2 years. Total cost of the…
Design, Construction of 12KM Water Pipeline – Size 10” Client: Council of the Governorate of Basra Location: Kubbaisa, Basrah Value: 1,330,000.00 USD Work Period:…
M&P + civil foundation installation 4 km flow line – size 6″ Client: BP Iraq/Rumaila Operating Organisation (ROO) Location: Rumaila Oil Field Value: 6,755,980.00 USD Starting Work:…
Pipeline Maintenance Contract Location: Basrah, Al-Zubair, Burjsia Project Implementation was scheduled for 2 years. Total cost of the…