Basra – Al-Zubair—Burjsia Pipelines-completed Project Implementation is scheduled for 2 years. Total cost of the project: $3,600,000 US Dollar. Share This Tweet Share Share Email Related Posts Pipeline Maintenance Contract Location: Basrah, Al-Zubair, Burjsia Project Implementation was scheduled for 2 years. Total cost of the… M&P + civil foundation installation 4 km flow line – size 6″ Client: BP Iraq/Rumaila Operating Organisation (ROO) Location: Rumaila Oil Field Value: 6,755,980.00 USD Starting Work:… Pipeline Installation Client: SOC / Ministry of Oil Location: Iraq Value: 36,000,000 USD Starting Work: 2010
Pipeline Maintenance Contract Location: Basrah, Al-Zubair, Burjsia Project Implementation was scheduled for 2 years. Total cost of the…
M&P + civil foundation installation 4 km flow line – size 6″ Client: BP Iraq/Rumaila Operating Organisation (ROO) Location: Rumaila Oil Field Value: 6,755,980.00 USD Starting Work:…
Pipeline Installation Client: SOC / Ministry of Oil Location: Iraq Value: 36,000,000 USD Starting Work: 2010